UK RENEWABLES PIPELINE 202611160020

● REPD OCTOBER 2026 · ALL PROJECTS ≥1 MW
V9.23 · REPD OCTOBER 2026 (Q3) · ONE NEWS FEED WITH MACHINE NOTES · BUILD · 16 November 2026 Canonical DESNZ REPD Q3 2026 (October 2026): 7,775 solar, BESS and wind records at ≥1 MW. Sixteen GB interconnectors on their own tab, outside the REPD spine. Loading canonical release contract… Official REPD source

GLOBALGRID2050 HEADLINES

Loading headlines… UK renewables, storage and grid headlines from public feeds, newest first · headlines and links only · a "possible match" is a name coincidence for review, not a confirmed link to a project

REPD PIPELINE ANALYTICS

FILTERED CAPACITY (MW)

0

FILTERED PROJECTS (≥1MW)

0

LARGEST SINGLE SITE (MW)

0
Loading all qualifying records… CSV contains the current filtered rows only
STATUS DISCIPLINE DEFAULT: every qualifying ≥1 MW record is loaded. Filters are user controls; they never redefine or truncate the pipeline. NEWS: relevance scores are algorithmic screening only and never change an official REPD fact. ATLAS: valid geometry resolves the exact REPD Ref. Missing geometry remains in search and CSV and is labelled NO MAP. MAP ON A PHONE: GridAtlas can open its project result card minimised so the map remains visible. Expand the card to read the nearest-substation screening. A distance is not available grid capacity or a connection offer. INTERCONNECTORS: not REPD records and never counted in ALL TECH. Their MAP link carries the link's own identity; a midpoint is a label anchor, not a location.
SITE NAME COUNTY OPERATOR TECHNOLOGY OFFICIAL REPD STATUS OFFICIAL CAPACITY REPD REF GLOBALGRID REF NEWS SIGNAL MACHINE READ NOTES ACTIONS
DATA SOURCES AND LICENCES REPD: Renewable Energy Planning Database, Department for Energy Security and Net Zero. Contains public sector information licensed under the Open Government Licence v3.0. HEADLINES: One public energy-infrastructure feed, with no content from the UK data-centre register. Machine Read Notes are candidate screening interpretations; original evidence and official REPD status remain separate.