UK RENEWABLES PIPELINE 202611140216

● 133 HEADLINES · 45 UK · 19 INTERNATIONAL · FULL ≥1 MW
V9.17 · REPD OCTOBER 2026 (Q3) · REGISTER CHANGES JULY TO OCTOBER 2026 · BUILD · 14 November 2026 Canonical DESNZ REPD Q3 2026 (October 2026): 7,775 solar, BESS and wind records at ≥1 MW. Sixteen GB interconnectors on their own tab, outside the REPD spine. Loading canonical release contract… Official REPD source

GLOBALGRID2050 ENERGY DAILY

UK requires canonical REPD binding · INTERNATIONAL is read from a committed build-time decision ledger · regional items never drive REPD project signals loading daily edition…
Loading today’s major-project newspaper…

REPD PIPELINE ANALYTICS

FILTERED CAPACITY (MW)

0

FILTERED PROJECTS (≥1MW)

0

LARGEST SINGLE SITE (MW)

0
Loading all qualifying records… CSV contains the current filtered rows only
STATUS DISCIPLINE DEFAULT: every qualifying ≥1 MW record is loaded. Filters are user controls; they never redefine or truncate the pipeline. NEWS: relevance scores are algorithmic screening only and never change an official REPD fact. ATLAS: valid geometry resolves the exact REPD Ref. Missing geometry remains in search and CSV and is labelled NO MAP. DATA CENTRES: each PROJECT RECORD names the nearest site in the UK data-centre register with its straight-line distance. This is screening context between two published points, not a grid connection, and data-centre MW is demand, never REPD capacity. INTERCONNECTORS: not REPD records and never counted in ALL TECH. Their MAP link carries the link's own identity; a midpoint is a label anchor, not a location.
SITE NAME COUNTY OPERATOR TECHNOLOGY OFFICIAL REPD STATUS OFFICIAL CAPACITY REPD REF GLOBALGRID REF NEWS SIGNAL ACTIONS