V9.6 DISCONTINUED · 24 AUGUST 2026 This release is retained for history only and must not be used. OPEN V9.6.1 — FROZEN V9.5.1 BASELINE WITH MOBILE REPAIR

UK RENEWABLES PIPELINE V9.6 · DISCONTINUED

● 133 HEADLINES · 45 REPD-BOUND · FULL ≥1 MW
V9.6 · CLEAN REBUILD FROM V9.5.1 · 23 August 2026 Canonical DESNZ REPD Q2 2026: 7,680 solar, BESS and wind records at ≥1 MW. Loading canonical release contract… Official REPD source

GLOBALGRID2050 ENERGY DAILY

V9.6 clean V9.5.1 clone · ALL preserves V9.4 volume · RELEVANT and project signals require exact REPD binding loading daily edition…
Loading today’s major-project newspaper…

REPD PIPELINE ANALYTICS

FILTERED CAPACITY (MW)

0

FILTERED PROJECTS (≥1MW)

0

LARGEST SINGLE SITE (MW)

0
OFFICIAL CAPACITY RANGE (MW) All official capacities
Loading all qualifying records… CSV contains the current filtered rows only
STATUS DISCIPLINE DEFAULT: every qualifying ≥1 MW record is loaded. Filters are user controls; they never redefine or truncate the pipeline. NEWS: relevance scores are algorithmic screening only and never change an official REPD fact. ATLAS: valid geometry resolves the exact REPD Ref. Missing geometry remains in search and CSV and is labelled NO MAP.
SITE NAME COUNTY OPERATOR TECHNOLOGY OFFICIAL REPD STATUS OFFICIAL CAPACITY REPD REF GLOBALGRID REF NEWS SIGNAL ACTIONS