● 133 HEADLINES · 45 UK · 19 INTERNATIONAL · FULL ≥1 MW
V9.19 · REPD OCTOBER 2026 (Q3) · CHARTING LIBRARY PINNED · BUILD · 14 November 2026Canonical DESNZ REPD Q3 2026 (October 2026): 7,775 solar, BESS and wind records at ≥1 MW. Sixteen GB interconnectors on their own tab, outside the REPD spine.Loading canonical release contract…Official REPD source
GLOBALGRID2050 ENERGY DAILY
UK requires canonical REPD binding · INTERNATIONAL is read from a committed build-time decision ledger · regional items never drive REPD project signalsloading daily edition…
Loading today’s major-project newspaper…
REPD PIPELINE ANALYTICS
FILTERED CAPACITY (MW)
0
FILTERED PROJECTS (≥1MW)
0
LARGEST SINGLE SITE (MW)
0
Loading all qualifying records…CSV contains the current filtered rows only
STATUS DISCIPLINEDEFAULT: every qualifying ≥1 MW record is loaded. Filters are user controls; they never redefine or truncate the pipeline.NEWS: relevance scores are algorithmic screening only and never change an official REPD fact.ATLAS: valid geometry resolves the exact REPD Ref. Missing geometry remains in search and CSV and is labelled NO MAP.DATA CENTRES: each PROJECT RECORD names the nearest site in the UK data-centre register (226 sites, the register's own ids) with its straight-line distance. This is screening context between two published points, not a grid connection, capacity or relationship; some register points are settlement-level approximations and are labelled; data-centre MW is demand, never REPD capacity. A data centre never carries a REPD Ref ID.INTERCONNECTORS: not REPD records and never counted in ALL TECH. Their MAP link carries the link's own identity; a midpoint is a label anchor, not a location.