GlobalGrid2050 V6

Separated Application Workspace

V6 starts by migrating the working V5 applications into separate folders so each app has its own HTML, CSS and JavaScript context. V5 remains untouched as the stable reference.

STATUS: TESTING AND DEVELOPMENT. Use at your own risk. Always verify the results and the data before using this tool for engineering, commercial, investment or project decisions.

Core Applications

Dashboards and Estimators

Literature, Processes and Case Studies

Solar Engineering Functions Supported By V6

V6 is a testing workspace for early solar PV and BESS engineering review. It helps users expose assumptions before projects move into detailed design, procurement, EPC delivery or investment approval.

1. Site and grid screening

Assess where a solar or BESS project sits in relation to grid infrastructure, substations and likely connection logic.

2. Solar BESS topology review

Review the relationship between solar PV, BESS, inverters, transformers and the grid connection point.

3. Single line diagram thinking

Visualise early SLD logic across DC, AC, LV, MV and grid interface assumptions.

4. DC string level reasoning

Support early review of DC string voltage margin, inverter input assumptions and DC side configuration.

5. AC and LV interface review

Support review of LV AC assumptions, inverter feeder status, insulation basis and transformer connection logic.

6. Cable route assumption review

Study route assumptions before formal design and before procurement decisions harden.

7. Cable geometry visualisation

Inspect cable arrangement, grouping, routing, trench logic and physical layout behaviour.

8. Cable loss awareness

Expose how cable distance, arrangement and topology may affect electrical losses and project value.

9. Thermal assumption visibility

Flag whether thermal assumptions are complete, missing, uncertain or requiring formal review.

10. Protection assumption visibility

Flag whether protection assumptions are complete, incomplete or need engineering review.

11. Manufacturer data confirmation

Track whether cable, containment, inverter or equipment data has been confirmed.

12. Module layout review

Review physical PV module count, rating, footprint, row, pitch and layout assumptions.

13. Engineering risk status

Mark assumptions as status unknown, study required, review required or formal design required.

14. Commercial engineering linkage

Connect topology, cable distance, grid proximity and losses to CAPEX, revenue, profit, cashflow and IRR sensitivity.

15. Atlas V8 wider grid analysis

Open the standalone Atlas V8 app for wider UK grid, infrastructure, project pipeline and spatial screening analysis alongside the V6 solar BESS tools.

16. Renewables pipeline context

Open UK renewables pipeline analysis to compare site screening work against wider market and project pipeline context.

17. Cable price screening

Use 33 kV, LV AC and DC cable price references to connect early topology assumptions with commercial procurement awareness.

18. Power systems study process

Use the power systems studies reference to understand which formal studies sit beyond early V6 and V7 screening outputs.

19. MV and HV connection pathway

Use the MV and HV component reference to connect early site and grid screening with the practical connection process.